Gate-level simulation and SDF
- Explain Gate-level simulation and SDF
- Apply the Wave 8 evidence model
- Identify unsupported sign-off claims
The lab does not simulate a gate netlist or parse SDF.
Why this matters
Use GLS selectively for reset, X, timing annotation and initialization risks not closed elsewhere.
Engineering method
- Freeze the requirement, units, legal operating range and observable evidence.
- Build the smallest model that exposes the decision behind Gate-level simulation and SDF.
- Exercise nominal, boundary and deliberately invalid cases.
- Record tool versions, assumptions, results and remaining uncertainty.
Guided practice
Classify zero-delay and SDF test objectives and failure triage evidence.
Wave 8 laboratory connection
Use Implementation readiness manifest for the reproducible Digital exercise. Keep source, command, raw result and a short interpretation together; a screenshot alone is not sufficient evidence.
Open-source limitation
The lab does not simulate a gate netlist or parse SDF.
Review questions
- Which requirement does the result demonstrate?
- What failure could still escape this model?
- Which evidence would be required before an assessed or tapeout claim?
Completion evidence
Submit the completed practice notes, the checker PASS/FAIL output, the exact source revision and a limitation statement in your Git repository.
Gate-level simulation and SDF review exercise
- Understand the task
- Run or reason
- Check the result
- Explain why
Classify zero-delay and SDF test objectives and failure triage evidence.
Record assumptions, artifact revision, command, result, interpretation and limitation.
Practice work is non-certified and is not stored by ASIC Campus.