Reconvergence and reset-domain crossings

Learning objectives
  • Explain Reconvergence and reset-domain crossings
  • Apply the Wave 4 model
  • Identify unsupported sign-off claims
Conceptual with a reproducible educational model

No netlist topology, recovery/removal timing or RDC tool is analysed.

1 Objective 2 Learn 3 Example 4 Practice 5 Verify 6 Continue
How to study this lessonUnderstand the idea first. Use the example to see the behaviour, practise where provided, then make sure you can explain the result before continuing.

Why this matters

Prevent independently synchronized signals from reconverging into an incoherent decision and control reset release per domain.

Engineering method

  1. Freeze the requirement, units, legal operating range and observable evidence.
  2. Build the smallest model that exposes the decision behind Reconvergence and reset-domain crossings.
  3. Exercise nominal, boundary and deliberately invalid cases.
  4. Record tool versions, assumptions, results and remaining uncertainty.

Guided practice

Find reconvergence and asynchronous reset-release risks in a small crossing inventory.

Wave 4 laboratory connection

Use CDC/RDC crossing classification model for the reproducible Digital exercise. Keep source, command, raw result and a short interpretation together; a screenshot alone is not sufficient evidence.

Open-source limitation

No netlist topology, recovery/removal timing or RDC tool is analysed.

Review questions

  • Which requirement does the result demonstrate?
  • What failure could still escape this model?
  • Which evidence would be required before an assessed or tapeout claim?

Completion evidence

Submit the completed practice notes, the checker PASS/FAIL output, the exact source revision and a limitation statement in your Git repository.

Engineering practice

Reconvergence and reset-domain crossings review exercise

  1. Understand the task
  2. Run or reason
  3. Check the result
  4. Explain why

Find reconvergence and asynchronous reset-release risks in a small crossing inventory.

Record assumptions, command, output, interpretation and limitation.

Practice work is non-certified and is not stored by ASIC Campus.