Setup, hold and timing paths
- Explain Setup, hold and timing paths
- Apply the Wave 7 model
- Identify unsupported sign-off claims
Simplified arithmetic omits graph propagation and cell/interconnect variation.
Why this matters
Separate maximum-delay setup analysis from minimum-delay hold analysis for each path.
Engineering method
- Freeze the requirement, units, legal operating range and observable evidence.
- Build the smallest model that exposes the decision behind Setup, hold and timing paths.
- Exercise nominal, boundary and deliberately invalid cases.
- Record tool versions, assumptions, results and remaining uncertainty.
Guided practice
Calculate arrival, required time and slack for representative paths.
Wave 7 laboratory connection
Use Static timing analysis model for the reproducible Digital exercise. Keep source, command, raw result and a short interpretation together; a screenshot alone is not sufficient evidence.
Open-source limitation
Simplified arithmetic omits graph propagation and cell/interconnect variation.
Review questions
- Which requirement does the result demonstrate?
- What failure could still escape this model?
- Which evidence would be required before an assessed or tapeout claim?
Completion evidence
Submit the completed practice notes, the checker PASS/FAIL output, the exact source revision and a limitation statement in your Git repository.
Setup, hold and timing paths review exercise
- Understand the task
- Run or reason
- Check the result
- Explain why
Calculate arrival, required time and slack for representative paths.
Record assumptions, command, output, interpretation and limitation.
Practice work is non-certified and is not stored by ASIC Campus.