Dynamic and leakage power
- Explain Dynamic and leakage power
- Apply the Wave 4 model
- Identify unsupported sign-off claims
No characterized cell library or power-analysis engine is used.
Why this matters
Separate switching, internal and leakage power and state the activity, voltage, frequency and corner assumptions.
Engineering method
- Freeze the requirement, units, legal operating range and observable evidence.
- Build the smallest model that exposes the decision behind Dynamic and leakage power.
- Exercise nominal, boundary and deliberately invalid cases.
- Record tool versions, assumptions, results and remaining uncertainty.
Guided practice
Calculate normalized dynamic power and compare activity-reduction options.
Wave 4 laboratory connection
Use Low-power sequencing model for the reproducible Digital exercise. Keep source, command, raw result and a short interpretation together; a screenshot alone is not sufficient evidence.
Open-source limitation
No characterized cell library or power-analysis engine is used.
Review questions
- Which requirement does the result demonstrate?
- What failure could still escape this model?
- Which evidence would be required before an assessed or tapeout claim?
Completion evidence
Submit the completed practice notes, the checker PASS/FAIL output, the exact source revision and a limitation statement in your Git repository.
Dynamic and leakage power review exercise
- Understand the task
- Run or reason
- Check the result
- Explain why
Calculate normalized dynamic power and compare activity-reduction options.
Record assumptions, command, output, interpretation and limitation.
Practice work is non-certified and is not stored by ASIC Campus.