Layout, DRC and LVS closure
- Explain Layout, DRC and LVS closure
- Apply the Wave 8 evidence model
- Identify unsupported sign-off claims
The checker does not inspect GDS or invoke DRC/LVS.
Why this matters
Preserve matching and isolation intent while closing DRC, LVS and review findings.
Engineering method
- Freeze the requirement, units, legal operating range and observable evidence.
- Build the smallest model that exposes the decision behind Layout, DRC and LVS closure.
- Exercise nominal, boundary and deliberately invalid cases.
- Record tool versions, assumptions, results and remaining uncertainty.
Guided practice
Record layout revision, rule-deck identity and closure summaries.
Wave 8 laboratory connection
Use Advanced AMS capstone manifest for the reproducible Analog exercise. Keep source, command, raw result and a short interpretation together; a screenshot alone is not sufficient evidence.
Open-source limitation
The checker does not inspect GDS or invoke DRC/LVS.
Review questions
- Which requirement does the result demonstrate?
- What failure could still escape this model?
- Which evidence would be required before an assessed or tapeout claim?
Completion evidence
Submit the completed practice notes, the checker PASS/FAIL output, the exact source revision and a limitation statement in your Git repository.
Layout, DRC and LVS closure review exercise
- Understand the task
- Run or reason
- Check the result
- Explain why
Record layout revision, rule-deck identity and closure summaries.
Record assumptions, artifact revision, command, result, interpretation and limitation.
Practice work is non-certified and is not stored by ASIC Campus.