Stability across load and capacitance

Learning objectives
  • Explain Stability across load and capacitance
  • Apply the Wave 4 model
  • Identify unsupported sign-off claims
Conceptual with a reproducible educational model

Two-pole/one-zero equations cannot replace loop-gain extraction from a transistor circuit.

1 Objective 2 Learn 3 Example 4 Practice 5 Verify 6 Continue
How to study this lessonUnderstand the idea first. Use the example to see the behaviour, practise where provided, then make sure you can explain the result before continuing.

Why this matters

Verify the loop across load current, output capacitance, ESR and PVT rather than one nominal point.

Engineering method

  1. Freeze the requirement, units, legal operating range and observable evidence.
  2. Build the smallest model that exposes the decision behind Stability across load and capacitance.
  3. Exercise nominal, boundary and deliberately invalid cases.
  4. Record tool versions, assumptions, results and remaining uncertainty.

Guided practice

Sweep a simplified pole/zero model and locate the minimum phase-margin case.

Wave 4 laboratory connection

Use LDO stability and corner model for the reproducible Analog exercise. Keep source, command, raw result and a short interpretation together; a screenshot alone is not sufficient evidence.

Open-source limitation

Two-pole/one-zero equations cannot replace loop-gain extraction from a transistor circuit.

Review questions

  • Which requirement does the result demonstrate?
  • What failure could still escape this model?
  • Which evidence would be required before an assessed or tapeout claim?

Completion evidence

Submit the completed practice notes, the checker PASS/FAIL output, the exact source revision and a limitation statement in your Git repository.

Engineering practice

Stability across load and capacitance review exercise

  1. Understand the task
  2. Run or reason
  3. Check the result
  4. Explain why

Sweep a simplified pole/zero model and locate the minimum phase-margin case.

Record assumptions, command, output, interpretation and limitation.

Practice work is non-certified and is not stored by ASIC Campus.