Schematic and pre-layout closure
- Explain Schematic and pre-layout closure
- Apply the Wave 8 evidence model
- Identify unsupported sign-off claims
No schematic or simulator database is evaluated.
Why this matters
Require operating-point, DC, AC, transient, noise, PVT and statistical evidence before layout.
Engineering method
- Freeze the requirement, units, legal operating range and observable evidence.
- Build the smallest model that exposes the decision behind Schematic and pre-layout closure.
- Exercise nominal, boundary and deliberately invalid cases.
- Record tool versions, assumptions, results and remaining uncertainty.
Guided practice
Index pre-layout reports and unresolved deviations.
Wave 8 laboratory connection
Use Advanced AMS capstone manifest for the reproducible Analog exercise. Keep source, command, raw result and a short interpretation together; a screenshot alone is not sufficient evidence.
Open-source limitation
No schematic or simulator database is evaluated.
Review questions
- Which requirement does the result demonstrate?
- What failure could still escape this model?
- Which evidence would be required before an assessed or tapeout claim?
Completion evidence
Submit the completed practice notes, the checker PASS/FAIL output, the exact source revision and a limitation statement in your Git repository.
Schematic and pre-layout closure review exercise
- Understand the task
- Run or reason
- Check the result
- Explain why
Index pre-layout reports and unresolved deviations.
Record assumptions, artifact revision, command, result, interpretation and limitation.
Practice work is non-certified and is not stored by ASIC Campus.